Deliverables - Public Access p2

M/D Milestone/Deliverable Date due Nature Dissemination level Status
WP3.1 Assessment of models & uncertainty analysis
D3.1.4 An updated written protocol detailing agreed procedures for UQ/UA. Jan-08 Report Public Completed
D3.1.5 First internal discussion paper by the NitroEurope-CarboEurope DNDC User Group with proposals for greater standardisation of UQ/UA. Jan-08 Report Public Completed
D3.1.6 UA/UQ protocol: The protocol will be updated on a regular basis with updated versions being periodically provided via the NEU web page Jan-09 Report Public Completed
D3.1.8 Internal report on Bayesian calibration of plot-scale models for the different ecosystem types using data from NEU field sites Oct-10 Other Public Completed
D3.1.9 Submitted paper on Bayesian calibration of plot-scale models for the different ecosystem types using data from NEU fiels sites Jul-10 Report Public Completed
WP3.2 Development of core models
D3.2.3 Report on model tests with improved versions Feb-09 Report Public Completed
D3.2.5 Publication summarizing NEU model comparison for forest ecosystems Sep-08 Report Public Completed
D3.2.7 Targeted workshops for model testing May-09, Dec-09 Report Public Completed
D3.2.8 Publications on model comparisson Mar-10 Other Public Completed
D3.2.9 Model code of Mobile3D-DNDC including pre- and postprocessing tool Apr-11 Other Public Completed
D3.2.10 Targeted workshops for model testing (Garmish-P) Mar-10 Other Public Completed
D3.2.11 Model comparison publications Oct-10 Other Public Completed
D3.2.12 Publication on Mobile2D-DNDC development and first application Nov-10 Other Public Completed
WP3.3 Interpretation and simulation of flux measnts.
D3.3.3 Series of manuscript submitted to peer reviewed journals Dec-08, May-09, Jul-09 Report Public Completed
D3.3.4 Guidelines for gap-filling flux measurements with the help of model results Jan-10 Report Public Completed
D3.3.5 Repository of simulations results for NEU sutes with NEU core models Oct-10 Report Public Completed
WP3.4 Development of GHG mitigation strategies for selected landuses and sites
D3.4.1 Report on the protocol to be used by core models to test response to climate change, land use change and mitigation measures (link to A5.4). Sep-07 Report Public Completed
D3.4.2 Report on site simulations with mitigation applied to provide for guidance on further activities at NEU sites and for European scale application. Dec-10 Report Public Completed
D3.4.3 Updated PCML protocol Jul-08 Report Public Completed
 
WP4.2 Development & application of landscape model
D4.2.1 Report detailing the selection of the sub- models for NitroScape. The report will emphasize the adaptation of each mode to NitroScape perspective and relation between models Apr-07 Report Public Completed
D4.2.2 Report on the choice of the procedure chosen for model linking for model integration making a synthesis on model linking based on a review of projects of integrated modelling Jun-07, May-08 Report Public Completed
D4.2.8 Report on the sensitivity study of the NitroScape landscape Mar-10 Report Public Completed
D4.2.9 Report on the appliation of the NitroScape model to first scenarios Apr-11 Report Public Completed
D4.2.10 General report on NitroScape development Nov-10 Report Public Completed
WP4.3 NEU landscapes verification measurements
D4.3.1 Report on methods (esp. inverse modelling and dispersion models) for estimating fluxes at landscape scale Jul-08 Report Public Completed
D4.3.2 Report on sampling strategy for providing input data to the NitroScape model on the different landscapes Aug-08 Report Public Completed
D4.3.3 Summary report of measurements carried out in all 6 landscapes; UPM lead with contributions from all landscape partners

Jan-09

May-10

Report

Report

Public

Public

Completed

Completed

D4.3.4 Verification data sets available for upload on the C4 database for all landscapes May-10 Demonstrator Public Completed

WP4.4 Application of the NitroScape model to the network of landscapes

D4.4.2 Report on the application of NitroScape model to different lanscapes Jan-11 Report Public Completed
D4.4.3 Report on the application of NitroScape model to the C4 scenarios from WP4.5 Jan-11 Report Public Completed
WP4.5 NEU C4 scenarios
D4.5.2 Preliminary list of changes and measures to be used in landscape scenarios of nitrogen flows and fluxes Feb-10 Report Public Completed
D4.5.3 Report on feedback from stakeholders on relevance of the selected indicators Jan-09 Report Public Completed
  <<PREVIOUS NEXT>>